Home Addition & Extension in Richmond Hill. Requirements and Challenges

UTES Development Team • February 23, 2025

Home Addition & Extension in Richmond Hill. Requirements and Challenges

Understanding Home Addition and Extension Permits in Richmond Hill


If you’re planning a home addition or extension in Richmond Hill, it’s essential to be aware of the city’s permit requirements to ensure a smooth process. One key element of this process is obtaining a site alteration permit, particularly when your project involves an addition exceeding 400 square feet.


Site Alteration Permit Requirements


For additions over 400 square feet, Richmond Hill mandates a site alteration permit, which necessitates the preparation of a grading plan by a Professional Engineer or Ontario Land Surveyor. This plan is vital for assessing the potential impacts of your project on surrounding land and infrastructure.



CCTV Inspection and Service Decommissioning

As part of the permit requirements, the City of Richmond Hill will charge a fee for a CCTV inspection to examine the existing underground services. Homes built before the 1970s often have asbestos-type sanitary lateral connections. If these are found, the city requires their decommissioning and replacement with new PVC sanitary connections. The cost for this service can range between $8,000 and $15,000, depending on the length of the connection and the location of the main sewer.


Storm Sewer and Drainage Requirements

In addition, if there is an existing storm sewer fronting the property, the city will typically require that the foundation drainage and front roof downspouts be connected to it. This connection can cost a similar amount as the sanitary service, adding another $8,000 to $15,000 to the project budget.

For rear roof downspouts, the city mandates that they be connected to a bio-retention cell in the backyard. The bio-retention cell must be sized based on calculations for a 1-in-50-year storm event to ensure adequate drainage capacity.



Upgrades for Multi-Dwelling Units

If your home addition project includes more than one dwelling unit, you will likely need to upgrade the existing water service to a 1-inch copper service. This upgrade typically costs between $10,000 and $14,000, depending on site conditions.


Tree Preservation and Arborist Reports

The city also requires a review of any potential tree impact as part of the site alteration permit. This step involves submitting an arborist report and obtaining permits for tree injury or removal. Associated costs include fees and security deposits for replanting new trees in lieu of any removed vegetation.


Final Steps Before Building Permit Application

A significant aspect of Richmond Hill’s process is that you must secure the final approved site alteration permit before applying for the main building permit. All fees related to the site alteration permit must be settled beforehand.


How We Can Help

Navigating the permit process can be complex, but our team at UTES Design & Build is here to assist you. We provide comprehensive support to streamline your project and handle all stages efficiently. Contact us today for a free consultation tailored to your specific project needs.


By UTES Design and Build Team February 13, 2026
Delays in Funding Threaten Housing Starts, Transit Expansion, and Local Construction Momentum
By UTES Design and Build Team February 6, 2026
A Major Step Toward a Cleaner, More Competitive Ontario
By UTES Design and Build Team January 30, 2026
Canada’s Construction Industry Is Growing, but the Road Ahead Isn’t Without Obstacles
By UTES Design and Build Team January 27, 2026
A Controversial Shift Aimed at Getting More Projects Built
By UTES Design and Build Team January 16, 2026
A New Era of Safer, Greener, and More Accessible Construction Across Canada
By UTES Design and Build Team January 9, 2026
A Step Toward Greener Construction and Industrial Innovation
By UTES Design and Build January 2, 2026
Big Changes Are Coming for Residential and Commercial Construction
By UTES Design and Build Team December 19, 2025
From “garbage in, garbage out” to decision-ready insights
By UTES Design and Build Team December 12, 2025
The Hidden Cost Behind Every New Home
By UTES Design and Build Team December 5, 2025
Preparing the Workforce for Housing and Infrastructure Boom
More Posts